get in touch


    PROJECT NAME  :
    BRIDGE ACROSS RIO DE OUREM, PANAJI
    CLIENT  :
    GOA STATE INFRASTRUCTURE DEVELOPMENT CORPORATION LIMITED (GSIDC)
    YEAR OF COMPLETION  :
    2017
    COST OF PROJECT  :
    22 CR
  • ABOUT THE PROJECT   : 

    GSIDC concerned with the infrastructural
    development, with an achievement of FastTrack development under its name, wanted the construction of the bridge of rua de Ourem to connect the Business hub of Panaji to the city limits.
    The bridge was an important urban addition to the area of Panjim as it gave an easier and shorter connectivity to the offices in the EDC patto area on one side to the other side of mala in Goa.
    A 110m long single segmented pre-stressed bridge was designed with a provision of services within the deck and completed in a record time.

Urban